Built by an Engineer, for Engineers
TworkX Constructability. Temporary works briefs, excavation and earthworks, drawing markups and reinforcement, for the engineers who deliver civil works. TworkX reads the design and never authors it.
Temporary works briefs
TworkX turns what the site knows into a brief a designer can rely on. It follows the TWfAU Temporary Works Risk Guidelines and Procedural Control Good Practice Guideline, published by Engineers Australia, and proposes the CFR, DCR and ER categories and the check category, each with its reasons, for you to decide. Gaps are flagged before issue and traced to their source, and every judgement of adequacy stays with the designer and the checker.
- Excavation and trench support: sections, plans and stage sketches drawn to scale, with angle of repose lines from plant and surcharges and clearance zones around services
- Formwork and falsework: every pour drawn to scale, with the full wet concrete head compared with the system's published rating, junctions, penetrations and the pre pour inspection
- Scaffolding: the brief, plus a component take-off and materials list for the supplier to price
- 465 questions and 436 gap rules across the three modules, each citing its source: the Work Health and Safety Act, regulations and codes of practice of every state and territory, the road and water authority specifications for excavation, and Australian Standards such as AS 4678, AS 3610.1 and AS/NZS 1576
- Issued in Word or PDF under your own letterhead, with the figures, the responsibility matrix and the open items register
Project data stays in your own database. Only the document pages you choose to have read are sent for reading, and only where your company has switched it on.
The gap check is deterministic. It tests the completeness of the brief, not the adequacy of any support system; the design remains the work of the nominated designer and the independent checker.